Kawasaki Ninja Service Manual

Kawasaki Ninja Service Manual

п»ї

Location of labels
All warning labels which are on your vehicle are repeated here. Read labels on your vehicle and understand them thoroughly. They contain information which is important for your safety and the saf ...

General Information
All rights reserved. No parts of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic mechanical photocopying, recording or oth ...

Other materials:

Mud Guard Installation
Installation is the reverse of removal. Note the following. Run the hose and lead correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). Check the brake line. Apply a non-permanent locking agent to the threads of the mud guard mounting bolts [A, B], and tighten them ...

Premuffler Chamber Installation
Replace the premuffler chamber gasket [A] with a new one. Install the premuffler chamber gasket to the premuffler chamber [B] until it is bottomed so that the chamfer side faces exhaust pipe [C]. Install the exhaust pipe clamp [D] as shown in the figure. Insert the projection [E] into ...

Air Intake Solenoid Valve Unit Test
Remove the air intake solenoid valve (see Air Intake Solenoid Valve Removal in the Fuel System (DFI) chapter). Set the hand tester [A] to the × 1 Ω range and connect it to the air intake solenoid valve terminals as shown in the figure. Special Tool - Hand Tester: 57001-1394 ...