Kawasaki Ninja Service Manual: Fuse

Kawasaki Ninja Service Manual / Electrical System / Fuse

Diode Circuit Inspection
Remove the relay box (see Relay Box Removal). Check conductivity of the following pairs of terminals (see Relay Box Internal Circuit in this section). Diode Circuit Inspection The resistan ...

30 A Main/15 A ECU Fuse Removal
Take the starter relay off the rear fender (see Starter Relay Inspection). Remove the starter relay cover Take the fuses [A] off the starter relay with needle nose pliers. ...

Other materials:

Engine Vacuum Synchronization Inspection
NOTE These procedures are explained on the assumption that the intake and exhaust systems of the engine are in good condition. Situate the motorcycle so that it is vertical. Remove: Fuel Tank (see Fuel Tank Removal in the Fuel System (DFI) chapter) Air Cleaner Housing (see Air Cleaner ...

Upper Fairing Assembly Disassembly
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal) Headlight (see Headlight Removal/Installation in the Electrical System chapter) City Light (LED) (see City Light (LED) Removal/Installation in the Electrical System chapter) Remove the screws [A], and separate each ...

Check 3-1: CAN Communication Line Resistance Inspection
Set the hand tester [A] to the ×1 Ω range and connect it to the terminal [11] and [12] in the meter unit. Special Tool - Hand Tester: 57001-1394 CAN Communication Line Resistance (at Meter Unit) Standard: 122 126 Ω If the tester reading is not specified, replace the meter ...