Hub Bearing Inspection
Exploded ViewAir Switching Valve
Air Switching Valve Operation Test
Refer to the Air Suction System Damage Inspection in the
Periodic Maintenance chapter.
Air Switching Valve Unit Test
Remove the air switching valve (see Air Switching Valve
Removal in the Engine Top End chapter).
Set the hand tester [A] to the × 1 ...
Connecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
DFI Servicing Precautions
There are a number of important precautions that should
be followed servicing the DFI system.
This DFI system is designed to be used with a 12 V sealed
battery as its power source. Do not use any other battery
except for a 12 V sealed battery as a power source.
Do not reverse the battery ...