Idle Speed Inspection
Refer to the Idle Speed Inspection in the Periodic Maintenance chapter.
Synchronization Inspection/Adjustment
Refer to the Engine Vacuum Synchronization Inspection in the Periodic Maintenance chapter.
Throttle Grip and Cables
Throttle Body Assy RemovalGear Position Switch Installation
Securely place the springs [A] and pins [B] into the holes
[C] of the shift drum.
Apply grease to the new O-ring [D].
Install the gear position switch [E].
Apply a non-permanent locking agent to the threads of
the gear position switch screws [F].
Tighten:
Torque - Gear Position Swit ...
Engine No. ZXT00JE003022
1. Heat Insulation Rubber Plate
2. For Air Switching Valve Hoses (Place the air switching valve above the
rubber plate.)
3. For Air Suction Valve Cover
4. For Throttle Body Assy Holder #2 and #3
5. For Throttle Body Assy Holder #1
6. For Water Temperature Sensor
7. Insert the tab into th ...
Hoses and Pipes
Hose Installation
Install the hoses and pipes, being careful to follow bending
direction. Avoid sharp bending, kinking, flattening or
twisting.
Run the hoses (see Cable, Wire, and Hose Routing section
in the Appendix chapter).
Install the clamp [A] as near as possible to the hose end
...