Kawasaki Ninja Service Manual: Charging System

Kawasaki Ninja Service Manual / Electrical System / Charging System

Refreshing Charge
Remove the battery (see Battery Removal). Do refresh charge by following method according to the battery terminal voltage. WARNINGThis battery is sealed type. Charge with current ...

Alternator Cover Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Air Cleaner Housing (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter) Bolt [A] ...

Other materials:

Battery Installation
Place the battery in the battery case. Connect the (+) cable to the (+) terminal, and then connect the (–) cable to the (–) terminal. NOTICE Installing the (–) cable to the (+) terminal of the battery or the (+) cable to the (–) terminal of the battery can seriously damaged ...

Idle Speed Control Valve Actuator Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Disconnect the idle speed control valve actuator connector and connect a suitable measuring leads [A] between these connectors as shown in the figure. Main Harness [B] Idle Speed Control Valve Actua ...

External Shift Mechanism Inspection
Examine the shift shaft [A] for any damage. If the shaft is bent, straighten or replace it. If the serration [B] are damaged, replace the shaft. If the spring [C] is damaged in any way, replace it. If the shift mechanism arm [D] is damaged in any way, replace the shaft. Check the s ...