Check 3-3: High Beam Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [7] to the battery (+) terminal.
Check that the high beam indicator light (LED) [A] goes
on.
If the indicator light does not go on, replace the meter unit.
...
Rocker Arm/Tie-Rod Bearing, Sleeve Inspection
NOTICE
Do not remove the bearings for inspection. Removal
may damage them.
Visually inspect the rocker arm, or tie-rod sleeves [A] and
needle bearings [B].
The rollers in a needle bearing normally wear very little,
and wear is difficult to measure. Instead of measuring,
inspect the ...
Mud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...