Torque and Locking AgentMud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...
Parts Removal/Installation
WARNINGGasoline is extremely flammable and can be
explosive
under certain conditions. Turn the ignition
switch OFF. Do not smoke. Make sure the area is
well-ventilated and free from any source of flame
or sparks; this includes any appliance with a pilot
light.
NOTICE
...
Master Cylinder Inspection (Visual Inspection)
Remove the master cylinders (see Front/Rear Master
Cylinder Removal).
Disassemble the front and rear master cylinders (see
Master Cylinder Rubber Parts Replacement in the Periodic
Maintenance chapter).
Check that there are no scratches, rust or pitting on the
inner wall [A] of each ma ...