Kawasaki Ninja Service Manual: Periodic Maintenance Procedures

Kawasaki Ninja Service Manual / Periodic Maintenance / Periodic Maintenance Procedures

Torque and Locking Agent
The following tables list the tightening torque for the major fasteners requiring use of a non-permanent locking agent or silicone sealant etc. Letters used in the “Remarks” column mean: AL ...

Fuel System (DFI)
...

Other materials:

Tie-Rod Removal
Squeeze the brake lever slowly and hold it with a band [A]. Remove the front footpeg bracket bolts [A]. Raise the rear wheel off the ground with the jack (see Rear Shock Absorber Removal). Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608 Remove: Upper ...

Engine Vacuum Synchronization Inspection
NOTE These procedures are explained on the assumption that the intake and exhaust systems of the engine are in good condition. Situate the motorcycle so that it is vertical. Remove: Fuel Tank (see Fuel Tank Removal in the Fuel System (DFI) chapter) Air Cleaner Housing (see Air Cleaner ...

Cylinder Head Removal
Remove: Thermostat Housing (see Thermostat Removal in the Cooling System chapter) Exhaust Pipe (see Exhaust Pipe Removal) Camshafts (see Camshaft Removal) Heat Insulation Plate [A] (see Engine Removal in the Engine Removal/Installation chapter) Place a container under the coolant dr ...