Kawasaki Ninja Service Manual: Periodic Maintenance Procedures

Kawasaki Ninja Service Manual / Periodic Maintenance / Periodic Maintenance Procedures

Torque and Locking Agent
The following tables list the tightening torque for the major fasteners requiring use of a non-permanent locking agent or silicone sealant etc. Letters used in the “Remarks” column mean: AL ...

Fuel System (DFI)
...

Other materials:

Coupling Bearing Installation
Replace the bearing with a new one. Press in the bearing [A] until it is bottomed. Special Tool - Bearing Driver Set [B]: 57001-1129 Pack the bearing with high-temperature grease. Replace the circlip with a new one. Special Tool - Inside Circlip Pliers: 57001-143 Replace the grease se ...

Front Wheel Removal
Remove: Front Caliper Mounting Bolts [A] (Both Sides) Front Caliper [B] (Both Sides) Loosen: Front Axle Clamp Bolts [A] (Right Side) Front Axle [B] Remove the lower fairings (see Lower Fairing Removal in the Frame chapter). Raise the front wheel off the ground. ...

Cylinder Head Removal
Remove: Thermostat Housing (see Thermostat Removal in the Cooling System chapter) Exhaust Pipe (see Exhaust Pipe Removal) Camshafts (see Camshaft Removal) Heat Insulation Plate [A] (see Engine Removal in the Engine Removal/Installation chapter) Place a container under the coolant dr ...