General Information
All rights reserved. No parts of this publication may be reproduced, stored
in a retrieval system, or
transmitted in any form or by any means, electronic mechanical photocopying,
recording or otherwise,
without the prior written permission of Quality Assurance Division/Motorcycle &
Engin ...
Oil Cooler Installation
Replace the O-ring [A] with a new one.
Apply grease to the new O-ring.
Install the water hoses and hose clamps [A] as shown in
the figure.
Water Hose (About 300 mm, 11.8 in.) [B]
Water Hose (About 130 mm, 5.1 in.) [C]
Yellow Paint [D]
Tighten:
Torque - Water Hose Clamp S ...
Check 3-4: Turn Signal Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [5] to the battery (+) terminal.
Connect the terminal [6] to the battery (+) terminal.
Check that the turn signal indicator light (LED) [A] goes
on.
If the indicator light does not go on, replace the meter ...