Special Tools
Brake Lever Position AdjustmentCoolant Reserve Tank Installation
Install the following to the coolant reserve tank [A].
Pad [B]
Gasket [C]
Cap [D]
Collar [E]
Install the coolant reserve tank and tighten the bolt [F].
Run the hoses correctly (see Cable,Wire, and Hose Routing
section in the Appendix chapter).
Fill the coolant reserve tank with ...
Clutch Lever Installation
Install the clutch lever so that the mating surface [A] of the
clutch lever clamp is aligned with the punch mark [B] of
the handlebar.
Tighten the upper clamp bolt first, and then the lower
clamp bolt.
Torque - Clutch Lever Clamp Bolts: 7.8 N·m (0.80 kgf·m, 69
in·lb)
There will be ...
Rear Shock Absorber Installation
Replace the rear shock absorber nuts and tie-rod nuts
with new ones.
Tighten:
Torque - Rear Shock Absorber Nuts: 34 N·m (3.5 kgf·m, 25
ft·lb)
Tie-Rod Nuts: 34 N·m (3.5 kgf·m, 25 ft·lb)
When installing the rear shock absorber bracket [A], install
it so that the recess side [B] ...