DFI Power Source
Fuel Pressure InspectionThrottle Body Assy Assembly
Before assembling, blow away dirt or dust from the throttle
body and delivery pipe assy by applying compressed air.
Replace the O-rings [A] of the joint pipe [B] with new ones.
Apply engine oil to the new O-rings, and insert it to the
delivery pipes [C].
Insert the joint pipe so th ...
Electrical Wiring
Wiring Inspection
Visually inspect the wiring for signs of burning, fraying,
etc.
If any wiring is poor, replace the damaged wiring.
Pull each connector [A] apart and inspect it for corrosion,
dirt, and damage.
If the connector is corroded or dirty, clean it carefully. If it
is da ...
Clutch Cover Removal
Remove:
Right Lower Fairing (see Lower Fairing Removal in the
Frame chapter)
Clutch Cable Lower End (see Cable Removal)
Clutch Cover Bolts [A]
Turn the release lever [A] counterclockwise as shown,
and remove the clutch cover.
About 90В° [B]
...