Exploded View
Drive Chain Slack InspectionAir Switching Valve
Air Switching Valve Operation Test
Refer to the Air Suction System Damage Inspection in the
Periodic Maintenance chapter.
Air Switching Valve Unit Test
Remove the air switching valve (see Air Switching Valve
Removal in the Engine Top End chapter).
Set the hand tester [A] to the × 1 ...
Air Intake Solenoid Valve Unit Test
Remove the air intake solenoid valve (see Air Intake Solenoid
Valve Removal in the Fuel System (DFI) chapter).
Set the hand tester [A] to the × 1 Ω range and connect it
to the air intake solenoid valve terminals as shown in the
figure.
Special Tool - Hand Tester: 57001-1394
...
Nozzle Assy Disassembly
Remove the nozzle assy (see Nozzle Assy Removal).
Pull out the secondary fuel injectors [A] from the delivery
pipe assy [B].
NOTE
Do not damage the insertion portions of the injectors
when they are pulled out from the delivery pipe assy.
NOTICE
Never drop the secondary fuel injecto ...