Kawasaki Ninja Service Manual: Steering Stem

Kawasaki Ninja Service Manual / Steering / Steering Stem

ESD (Electronic Steering Damper) ECU Installation (ZX1000JD/KD)
Install the ESD ECU [A] in the rubber protector [B]. Connect the ESD ECU connector. Install the ESD ECU on the air cleaner housing. Install the removed parts (see appropriate chapters). ...

Stem, Stem Bearing Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Front Fender (see Front Fender Removal in the Frame chapter) Front Wheel (see Front Wheel Removal ...

Other materials:

ZX1000JB/KB Models
1. Run the fuse box 2 lead in front of the rib for the fuse box 2. 2. Seat Lock Cable 3. Hook the licence plate light lead and the left turn signal light lead on the projection of the tool kit case. 4. Rib for Fuse Box 2 5. Run the starter relay lead in back of the rib for the fuse box 2 ...

Intake Air Pressure Sensor #1 Installation
NOTE The intake air pressure sensor #1 is the same part as the intake air pressure sensor #2. Installation is basically the reverse of removal. Position the intake air pressure sensor #1 [A] between the projections [B] on the rubber damper. Install the rubber damper [A] on the bracket ...

Nozzle Assy Assembly
Before assembling, blow away dirt or dust from the delivery pipes [A] by applying compressed air [B]. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine oil to the new O-rings, and insert it to the delivery pipes [C] Insert the joint pipe so that the step ...