Tie-Rod Operation Inspection
Steering Play InspectionNozzle Assy Assembly
Before assembling, blow away dirt or dust from the delivery
pipes [A] by applying compressed air [B].
Replace the O-rings [A] of the joint pipe [B] with new ones.
Apply engine oil to the new O-rings, and insert it to the
delivery pipes [C]
Insert the joint pipe so that the step ...
For Secondary Fuel Injectors
Remove the fuel tank (see Fuel Tank Removal).
Disconnect the injector connector and connect the harness
adapter [A] between these connectors as shown in
the figure.
Main Harness [B]
Secondary Fuel Injector #1 [C]
Special Tool - Measuring Adapter: 57001-1700
Connect a digital me ...
Meter Unit Circuit (ZX1000J Model)
1. Ignition Switch
2. Joint Connector F
3. Stop Watch Button
4. Oil Pressure Switch
5. Crankshaft Sensor
6. Water Temperature Sensor
7. Gear Position Switch
8. Intake Air Temperature Sensor
9. ESD ECU (ZX1000JD/KD)
10. ECU
11. Rear Wheel Rotation Sensor
12. Engine Ground
13. Battery ...