Kawasaki Ninja Service Manual: Steering

Kawasaki Ninja Service Manual / Periodic Maintenance / Periodic Maintenance Procedures / Steering

Tie-Rod Operation Inspection
Pump the rear seat down and up 4 or 5 times, and inspect the smooth stroke. If the tie-rod [A] do not smoothly stroke or noise is found, inspect the fasteners and tie-rod bearings (see Tie-R ...

Steering Play Inspection
Remove the lower fairings (see Lower Fairing Removal in the Frame chapter). Raise the front wheel off the ground with the jack. Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608 ...

Other materials:

Drive Chain Removal/Installation
NOTE Since the drive chain is installed through the swingarm, The chain can not be removed other than by cutting it. Prepare the new link pin, link plate, grease seals, and tools for rejoining the chain. Remove: Bolts [A] Front Footpeg Bracket [B] Remove: Bolts [A] Chain Cover [B] ...

Rear Frame Front Removal
Remove: Rear Frame Rear (see Rear Frame Rear Removal) Rear Fender Front (see Rear Fender Front Removal) Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracket [B] Rear Frame Front Bolts [C] Left Rear Frame Front [D] Remove: Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracke ...

Connecting Rod Big End Bearing Insert/Crankpin Wear Inspection
Remove the connecting rod big end (see Connecting Rod Removal). Cut strips of plastigage to crankpin width. Place a strip on the crankpin parallel to the crankshaft installed in the correct position. Tighten the connecting rod big end nuts to the specified torque (see Connecting Rod I ...