Engine Stop Switch Operation Inspection
Chassis Parts LubricationCheck 3-7 Stop Watch Inspection
Connect the leads in the same circuit as Check 3-2.
By pushing the upper button each time to set the stop
watch mode.
Connect the insulated auxiliary lead processed insulation
to the terminal [13] as shown in the figure, then stop watch
start to count.
While count the stop watch, conn ...
Wheels
Tubeless tires are installed on the
wheels of this motorcycle. The indications
of “TUBELESS” on the tire side
wall and the rim show that the tire and
rim are specially designed for tubeless
use.
A. “TUBELESS” Mark
A. “TUBELESS” Mark
The tire and rim form a leakproof unit
by ...
Mud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...