Stick Coil Primary Winding Resistance Inspection
Refer to the Stick Coil Inspection in the Electrical System chapter.
If the reading is within the standard, check the input voltage (see Stick Coil Input Voltage Inspection).
Stick Coil Input Voltage InspectionCheck 2-2: Fuel Level Warning Inspection
Remove:
Fuel Tank (see Fuel Tank Removal in the Fuel System
(DFI) chapter)
Connect the resistor(s) [A] (about 50 to 100 Ω) between
the fuel pump connector terminal [B] of the main harness
side and the battery negative (–) terminal [C] as shown.
Turn the ignition switch ...
Connecting Rod Bend Inspection
Remove the connecting rod big end bearing inserts, and
reinstall the connecting rod big end cap.
Select an arbor [A] of the same diameter as the connecting
rod big end, and insert the arbor through the connecting
rod big end.
Select an arbor of the same diameter as the piston pin
and ...
Diode Circuit Inspection
Remove the relay box (see Relay Box Removal).
Check conductivity of the following pairs of terminals (see
Relay Box Internal Circuit in this section).
Diode Circuit Inspection
The resistance should be low in one direction and more
than 10 times as much in the other direction. If any dio ...