Kawasaki Ninja Service Manual: Air Intake Duct Removal

Kawasaki Ninja Service Manual / Fuel System (DFI) / Air Line / Air Intake Duct Removal

Air Intake Duct Removal


Air Line
...

Air Intake Duct Installation
Check that the pad [A] is in place on the air intake duct. Apply a non-permanent locking agent to the threads of the air intake duct mounting bolts, and tighten them. Run the lead correctly ( ...

Other materials:

Stem, Stem Bearing Installation
Replace the bearing outer races with new ones. Drive them into the head pipe at the same time. Special Tools - Head Pipe Outer Race Press Shaft [A]: 57001-1075 Head Pipe Outer Race Driver, 55 [B]: 57001 -1446 or Bearing Driver Set: 57001-1129 Apply grease to the outer races. ...

Stator Coil Installation
Apply a non-permanent locking agent to the threads of the stator coil bolts and tighten them. Torque - Stator Coil Bolts: 12 N·m (1.2 kgf·m, 106 in·lb) Using a high flash-point solvent, clean off any oil or dirt that may be on the silicone sealant coating area. Dry them with a clea ...

Fuel Tank Installation
Note the above WARNING (see Fuel Tank Removal). Run the hoses correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). Check that the dampers [A] are in place on the fuel tank. If the dampers are damaged or deteriorated, replace them. If the fuel tank brack ...