NOTE
Be sure the battery is fully charged.
For Secondary Fuel Injectors
For Primary Fuel InjectorsTie-Rod Removal
Squeeze the brake lever slowly and hold it with a band
[A].
Remove the front footpeg bracket bolts [A].
Raise the rear wheel off the ground with the jack (see
Rear Shock Absorber Removal).
Special Tools - Jack: 57001-1238
Jack Attachment: 57001-1608
Remove:
Upper ...
Tire Removal
Remove:
Wheels (see Front/Rear Wheel Removal)
Valve Core (Let out the air)
To maintain wheel balance, mark the valve stem position
on the tire with chalk so that the tire can be reinstalled in
the same position.
Chalk Mark or Yellow Mark [A]
Valve Stem [B]
Align [C]
Lu ...
Mud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...