

Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608

Tie-Rod Installation
Rocker Arm RemovalConnecting Rod Twist Inspection
With the big-end arbor [A] still on V block [C], hold the
connecting rod horizontally and measure the amount that
the arbor [B] varies from being paralleled with the surface
plate over a 100 mm (3.94 in.) length of the arbor to determine
the amount of connecting rod twist.
If the conne ...
Exhaust Pipe Installation
Replace the exhaust pipe gaskets [A] and premuffler
chamber gasket [B] with new ones.
Install the premuffler chamber gasket to the premuffler
chamber [C] until it is bottomed so that the chamfer side
faces exhaust pipe [D].
Install the exhaust pipe clamp [E] as shown in the figure.
I ...
Vehicle-down Sensor Installation
Be sure to install the rubber dampers [A] and collars [B]
on the bracket.
The UP mark [A] of the sensor should face upward.
WARNINGIncorrect installation of the vehicle-down
sensor
could cause sudden loss of engine power. The
rider could lose balance during certain ...