Squeeze the brake lever slowly and hold it with a band. Remove the front footpeg bracket bolts. Raise the rear wheel off the ground with the jack (see Rear Shock Absorber Removal). Special ...

Other materials:

Connecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance. Insert a thickness gauge [A] between the big end and either crank web to determine clearance. Connecting Rod Big End Side Clearance Standard: 0.13 0.38 mm (0.0051 0.0150 in.) Service Limit: 0.58 mm (0.023 in.) If the clearance exceeds ...

Idle Speed Control Valve Actuator Installation
Replace the O-ring [A] with a new one. Apply engine oil to the new O-ring. Install the idle speed control valve [A] as shown in the figure. 10° [B] Tighten: Torque - Idle Speed Control Valve Actuator Retainer Screws: 2.06 N·m (0.21 kgf·m, 18 in·lb) Install th ...

Rebound Damping Force Adjustment
To adjust the rebound damping force, turn the rebound damping adjuster [A] to the desired position. The standard adjuster setting is the 1 3/4 turns out from the fully clockwise position. Rebound Damping Force Adjustment ...