Kawasaki Ninja Service Manual: Camshaft Chain Installation

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Chain Installation

Camshaft Chain Installation


Camshaft Chain Removal
Remove: Camshafts (see Camshaft Removal) Timing Rotor (see Timing Rotor Removal in the Electrical System chapter) Front and Rear Camshaft Chain Guides (see Cylinder Head Removal) Remove ...

Cylinder Head
...

Other materials:

External Shift Mechanism Installation
Install the gear positioning lever [A] as shown in the figure. Install: Spring [B] Washer [C] Tighten: Torque - Gear Positioning Lever Bolt [D]: 12 N·m (1.2 kgf·m, 106 in·lb) Assemble: Ratchet [A] Pawls [B] Pins [C] Springs [D] Install the shift ratchet ...

Intake Air Pressure Sensor #2 Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the air cleaner housing (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter). Disconnect the intake air pressure sensor #2 connector and connect the measuring adapter [A] between these con ...

Check 2-3: Intake Air Temperature Inspection
Disconnect the intake air temperature sensor connector [A] (see Intake Air Temperature Sensor Removal in the Self-Diagnosis System chapter). Connect the variable rheostat [B] to the R/BK lead [C] and BR/BK lead [D] terminals. Turn the ignition switch to ON. Read the temperatur ...