Kawasaki Ninja Service Manual: Camshaft Runout Inspection

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Runout Inspection

If the runout exceeds the service limit, replace the camshaft.

Camshaft Runout Standard: TIR 0.02 mm (0.0008 in.) or less Service Limit: TIR 0.1 mm (0.004 in.)

Camshaft Runout Inspection


Camshaft, Camshaft Cap Wear Inspection
Remove the camshaft caps (see Camshaft Removal). Cut the strips of plastigage (press gauge) to journal width. Place a strip on each journal parallel to the camshaft installed in the correct ...

Cam Wear Inspection
Remove the camshafts (see Camshaft Removal). Measure the height [A] of each cam with a micrometer. If the cams are worn down past the service limit, replace the camshaft. Cam Height Standar ...

Other materials:

Rear Shock Absorber Removal
Remove: Lower Fairings (see Lower Fairing Removal in the Frame chapter) Fuel Tank (see Fuel Tank Removal in the Fuel System chapter) Bolts [A] (Both Sides) Foot Guard [B] (Both Sides) Squeeze the brake lever slowly and hold it with a band [A]. WARNINGBe sure to h ...

Balancer Installation
Position the crankshaft at #2, 3 positions TDC or at #1, 4 positions TDC. Install the balancer assembly as follows. Align the punch mark [A] on the weight and the projection [B] on the crankcase. Engage the balancer gear and the crankshaft gear. Insert the balancer shaft until it is bot ...

Exhaust Pipe Installation
Replace the exhaust pipe gaskets [A] and premuffler chamber gasket [B] with new ones. Install the premuffler chamber gasket to the premuffler chamber [C] until it is bottomed so that the chamfer side faces exhaust pipe [D]. Install the exhaust pipe clamp [E] as shown in the figure. I ...